Skip to main content
Agora Labs

Audit and consulting

Audit and consulting, when a project isn't needed.

Not everything starts with software. Sometimes a quality system needs reviewing before an audit, a team needs a clearer way of working, or a process problem needs solving with data. These services are engaged on their own, with a scope agreed before work begins.

Behind it

  • ISO 9001 Lead Auditor
  • Agile Lead
  • Scrum Master
  • Scrum Product Owner
  • Lean Six Sigma Green Belt
  • Lean Six Sigma Yellow Belt

These are credentials held by people on the team, not certifications of Agora Labs as a company.

Audit

Quality audits with a lead auditor's eye.

We review your quality management system against the requirements of ISO 9001 and hand you findings backed by evidence, so you know where you stand and what to fix.

Agora Labs does not certify. ISO 9001 certification is issued by an accredited certification body; our audits are internal or of suppliers, and they help you prepare.

  1. A·01

    Backed byISO 9001 Lead Auditor

    ISO 9001 internal audit

    A first-party audit of your management system: an audit plan, interviews, a review of records and a report of findings with their evidence.

    When it fits

    When you need to know whether your management system complies: before an external audit, or as part of your yearly audit programme.

    What you get

    • The audit plan, agreed with you
    • A report of findings, each with its evidence and its clause
    • A closing meeting with the audited team
  2. A·02

    Backed byISO 9001 Lead Auditor

    Gap assessment

    Before you seek certification, a review of what your organisation meets today and what is missing, in order of priority.

    When it fits

    When you have no formal management system yet, or do not know how far you are from seeking certification.

    What you get

    • The requirements of ISO 9001 set against what exists today
    • The gaps, in order of priority
    • A roadmap to close them
  3. A·03

    Backed byISO 9001 Lead Auditor

    Supplier audit

    A second-party assessment of a supplier against requirements agreed with you, so the decision rests on evidence.

    When it fits

    When a supplier is critical to your quality and you need to decide on evidence, not impressions.

    What you get

    • The assessment criteria, agreed with you
    • A visit report with findings and evidence
    • A recommendation: approve, approve with conditions or drop
  4. A·04

    Backed byISO 9001 Lead Auditor

    Certification audit readiness

    A review of the documentation and a dry run with the team, so you reach the certification body's audit with the findings already identified.

    When it fits

    When you already have a date with the certification body and want to arrive with the findings identified.

    What you get

    • A review of the system's documentation
    • A mock audit with your team
    • The list of findings to address before the date

Consulting

Consulting in agility and continuous improvement.

We work alongside teams and process owners with agile frameworks and Lean Six Sigma, chosen for the kind of work rather than out of habit.

Scrum is not for every project: the framework is chosen in a first conversation, according to the kind of work.

  1. C·01

    Backed byAgile LeadScrum Master

    Agility and Scrum

    Support to adopt Scrum where the work is complex and changing, or Kanban where it is a continuous flow: roles, events, the board and flow metrics.

    When it fits

    When a team works on something complex and changing, or on a steady stream of requests, and struggles to see and prioritise the work.

    What you get

    • The framework chosen for your kind of work: Scrum, Kanban or something simpler
    • Roles, events and a board working with your team
    • Flow metrics to keep improving
  2. C·02

    Backed byScrum Product Owner

    Product ownership

    Help defining a product's vision, building and prioritising the backlog and writing verifiable acceptance criteria.

    When it fits

    When a product or system is being built and it is unclear what to build first, or how to tell that something is done.

    What you get

    • The product vision, written down and agreed
    • A prioritised backlog
    • Verifiable acceptance criteria
  3. C·03

    Backed byLean Six Sigma Green Belt

    Lean Six Sigma projects

    Bounded improvement projects with DMAIC: define the problem, measure the current state, analyse causes, improve and leave controls in place.

    When it fits

    When a process problem keeps coming back, can be measured, and nobody quite knows why it happens.

    What you get

    • The problem defined and measured
    • Its causes analysed with data
    • Improvements in place and the controls to sustain them
  4. C·04

    Backed byLean Six Sigma Yellow Belt

    Process mapping and standardisation

    Capture how the work really flows with SIPOC or Value Stream Mapping, and leave the process agreed in writing, with owners and controls.

    When it fits

    When everyone runs the process their own way, or nobody has the full picture of how the work flows.

    What you get

    • A map of the process as it runs today (SIPOC or Value Stream Map)
    • The process agreed in writing
    • Owners and controls defined

Getting started

Not sure which one you need?

Tell us the problem and we will tell you which service fits, or whether none does. The scope and the deliverables are agreed before any work begins.